Follow us

Stay Connected

Archive

Update on Asphalt Repairs

31/07/2026

Asphalt Repair  Please be advised that due to the weather the asphalt repair is now scheduled for the first week of August.


Boil Water Advisory Lowe Farm

30/07/2026

Boil Water Advisory Lowe Farm Please be advised, that due to an unexpected power outage and generator failure, residents in Lowe Farm will experience water pressure drops once the water is turned back on, a BWA will be in effect immediately.  It will remain in effect until water results are received, which could be a […]


Payment Option Changes

17/07/2026

Payment Option Changes Please be advised that after July 31st we will no longer be receiving payments from the following banks: PC Bank Manulife Citibank Meridian Credit Union Tangerine JPMorgan Chase TFX Bank of America These banks do not report payment details to us like who the payment is from, how much was paid, or […]


Election Official Job Advertisement

16/07/2026

Election Official Job Advertisement Please see the below details on the Election Official Job Listing, with upcoming elections taking place this fall we will need people to help manage the polls. There is a form to fill out on the second page of the advertisement, have that filled out and sent back to us for […]


June and July Minutes

15/07/2026

June and July Minutes June 10 2026 July 8 2026


Roads Now Opened

13/07/2026

Roads Now Opened Please be advised that the following roads are now open for use: Road 2W between RD30N and 31N Road 2W from 205 to RD36N 2E Bridge and Road


Garbage/Recycling Tender Packages

13/07/2026

Garbage/Recycling Tender Packages Please click on the links below for the tender packages for Garbage 2027-2030 and Recycling 2027-2030.  RFP for Solid Waste Collection – 2027 to 2030 RFP for Recycling Collection – 2027-2030


Update on Road 28N

06/07/2026

Road 28N Please be advised that Road 28N is now back open, however take caution when driving on it in case the water levels rise again. 


Road Closure 28N

03/07/2026

Road Closure Please be advised that road 28N, between road 1E to 2E, is currently closed due to water.


Road Closure 2W

02/07/2026

Please be advised that the below will be closed until further notice as they are currently under water. Road 2W between Road 30N and Road 31N Road 2W from 205 to Road 36N


Skip to toolbar